Review the material roles#
| Role | What to check |
|---|---|
| Base Material | The acoustic starting material associated with the surface/construction. |
| Finish | The finish assigned to the surface. |
| Acoustic treatment | A deliberate treatment assignment and its coverage. |
Review the final exposed composition and area on the selected surface. A material record in the library does not by itself establish an assignment in the project.
Choose the right editing place#
- Use main-window Surface Materials for shared construction baseline mappings.
- Use Room Analysis for intentional room-specific finishes, treatment and coverage.
- Use Material Library to inspect or author a material’s data.
- Review Acoustic Ray Materials for included constructions and shared assignment readiness.
Read readiness states#
| State/message | What to do |
|---|---|
| Assigned / resolved | Check the chosen material’s actual suitability and provenance. |
| Generic | Review the exposed placeholder or generic material assumption. |
| Needs review / conflict | Inspect the affected construction and proposed assignment. |
| Missing / unavailable | Resolve the reference or source problem before relying on the result. |
An analysed result can still contain material assumptions that need review. Keep the readiness message with any interpretation rather than treating a completed run as input approval.