Analysis leaves the model
Teams often export geometry, rebuild spaces in separate tools, and repeat the setup whenever the design changes.
Product overview
Acouso-ROOM helps project teams understand room-acoustic performance without exporting models, rebuilding geometry, or moving design decisions out of the Revit environment.
Two-page PDF overview · ideal to skim or share before a meeting.

The problem
Teams often export geometry, rebuild spaces in separate tools, and repeat the setup whenever the design changes.
When acoustic issues are found after layouts and finishes are locked in, the next step is harder to coordinate.
Reports and spreadsheets can explain an issue, but they rarely show the design team exactly where it lives in Revit.
The solution
Acouso puts acoustic analysis inside the same environment used to shape rooms, select finishes, coordinate disciplines, and review design intent. That makes performance easier to test while the team can still act on the result.
Use the coordinated model as the source of truth for rooms, finishes, materials, and design intent.
Evaluate acoustic performance while the project team can still see the surrounding rooms, elements, and constraints.
Identify what passes, what needs attention, and what design change is likely to move the project forward.


From analysis to action
Acouso turns acoustic review into a project workflow. Teams can move from individual room analysis to a schedule of results, helping them identify which spaces pass, which need treatment, and where the next design conversation should focus.
Product paths
Acouso-ROOM brings room acoustic analysis into Revit — starting with free, limited access and scaling to a full licence. Acouso-PLAN uses building-model information to inform acoustic requirements and markups for design coordination, with invitation-only early access for selected teams.
Detailed room acoustic analysis directly inside Revit — starting with free, limited access.
Acouso-ROOM Free is the current no-charge evaluation level of Acouso-ROOM, not a separate product. The same installer currently provides result viewing, import/export, and limited reflection analysis after the 14-day trial.
The full licence adds
Acoustic requirements and markups informed by building-model context, through invitation-only early access.
Evaluation path
New users can start with a 14-day Acouso-ROOM trial, with no credit card and no account setup. After the trial, teams can use the currently available Acouso-ROOM Free level, purchase Acouso-ROOM access, or talk to Acouso about PLAN early access for acoustic markups and coordination.
14
days of full Acouso-ROOM access
0
credit card or account setup required
1
Revit workflow from model to results
Start with Acouso-ROOM, or get in touch to discuss whether Acouso-PLAN is the right fit for acoustic markups and coordination.